NM-14 over San Pedro Creek
FairSandoval County, New Mexico · 10.8 MI N JCT I-40/NM-14 · Structure no. 000000000008939
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 100 ft
- 1 main span
- Daily traffic
- 5,788
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
NM-14 over San Pedro Creek is a prestressed concrete stringer/multi-beam or girder carrying NM-14 over San Pedro Creek in Sandoval County, New Mexico. It was built in 1996, so it is 29 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,788 vehicles a day, roughly 11% of them trucks, projected to reach 7,871 by 2043. The structure is 100 ft (30.5 m) long and 43 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NM-14 over San Pedro Creek built?
It was built in 1996, making it 29 years old in 2025.
What condition is NM-14 over San Pedro Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does NM-14 over San Pedro Creek carry?
About 5,788 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is NM-14 over San Pedro Creek?
The structure is 100 ft (30.5 m) long with a longest span of 96 ft (29.3 m) and a deck 43 ft wide.
Who owns NM-14 over San Pedro Creek?
It is owned by the State Highway Agency.