I-25 Sbl over Tonque Arroyo
FairSandoval County, New Mexico · 10.5 M N JCT US-550 · Structure no. 000000000008375
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 341 ft
- 4 main spans
- Daily traffic
- 40,791
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Sbl over Tonque Arroyo is a prestressed concrete continuous stringer/multi-beam or girder carrying I-25 Sbl over Tonque Arroyo in Sandoval County, New Mexico. It was built in 1984, so it is 41 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 40,791 vehicles a day, roughly 45% of them trucks, projected to reach 55,475 by 2043. The structure is 341 ft (103.9 m) long and 45 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Sbl over Tonque Arroyo built?
It was built in 1984, making it 41 years old in 2025.
What condition is I-25 Sbl over Tonque Arroyo in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does I-25 Sbl over Tonque Arroyo carry?
About 40,791 vehicles per day (2023 count), of which roughly 45% are trucks.
How long is I-25 Sbl over Tonque Arroyo?
The structure is 341 ft (103.9 m) long with a longest span of 86 ft (26.2 m) and a deck 45 ft wide.
Who owns I-25 Sbl over Tonque Arroyo?
It is owned by the State Highway Agency.