Fdr 274 over Vallecitos River
FairPosted for loadRio Arriba County, New Mexico · 3.4 Nw/O Nm 111 Int · Structure no. 030202000001023
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected July 2024
- Type
- Slab
- Concrete Continuous
- Length
- 80 ft
- 3 main spans
- Daily traffic
- 125
- 2022 count
- Owner
- Federal
- U.S. Forest Service
About this bridge
Fdr 274 over Vallecitos River is a concrete continuous slab carrying Fdr 274 over Vallecitos River in Rio Arriba County, New Mexico. It was built in 1959, so it is 66 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 125 vehicles a day, roughly 5% of them trucks, projected to reach 155 by 2040. The structure is 80 ft (24.4 m) long and 16 ft wide. If it were closed, the detour would be 98.2 mi (158 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fdr 274 over Vallecitos River built?
It was built in 1959, making it 66 years old in 2025.
What condition is Fdr 274 over Vallecitos River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Fdr 274 over Vallecitos River carry?
About 125 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Fdr 274 over Vallecitos River?
The structure is 80 ft (24.4 m) long with a longest span of 26 ft (7.9 m) and a deck 16 ft wide.
Who owns Fdr 274 over Vallecitos River?
It is owned by the U.S. Forest Service.