IRR BIA RTE 2 over Navajo River
FairRio Arriba County, New Mexico · 2.4 KM North of Dulce Nm · Structure no. 00000000000M316
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 109 ft
- 3 main spans
- Daily traffic
- 100
- 2023 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 2 over Navajo River is a concrete continuous stringer/multi-beam or girder carrying IRR BIA RTE 2 over Navajo River in Rio Arriba County, New Mexico. It was built in 1984, so it is 41 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 5% of them trucks, projected to reach 117 by 2043. The structure is 109 ft (33.2 m) long and 34 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 2 over Navajo River built?
It was built in 1984, making it 41 years old in 2025.
What condition is IRR BIA RTE 2 over Navajo River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does IRR BIA RTE 2 over Navajo River carry?
About 100 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is IRR BIA RTE 2 over Navajo River?
The structure is 109 ft (33.2 m) long with a longest span of 70 ft (21.3 m) and a deck 34 ft wide.
Who owns IRR BIA RTE 2 over Navajo River?
It is owned by the Bureau of Indian Affairs.