US Bridges

NM-581 over Arroyo Seco

Fair

Rio Arriba County, New Mexico · 0.10 MI N of JCT Nm 399 · Structure no. 000000000008150

Built
1979
46 years old
Condition
Fair
inspected September 2024
Type
Slab
Concrete Continuous
Length
121 ft
4 main spans
Daily traffic
1,086
2023 count
Owner
State
State Highway Agency

About this bridge

NM-581 over Arroyo Seco is a concrete continuous slab carrying NM-581 over Arroyo Seco in Rio Arriba County, New Mexico. It was built in 1979, so it is 46 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,086 vehicles a day, roughly 5% of them trucks, projected to reach 1,476 by 2043. The structure is 121 ft (37 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNM-581
CrossesArroyo Seco
Location0.10 MI N of JCT Nm 399
RouteState Highway 581
Coordinates35.97163, -106.06176
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating70.4 US tons
Inventory rating42.1 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length121 ft (37 m)
Longest span33 ft (10 m)
Deck width33 ft (10 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,086 (2023)
Projected traffic1,476 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NM-581 over Arroyo Seco built?

It was built in 1979, making it 46 years old in 2025.

What condition is NM-581 over Arroyo Seco in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does NM-581 over Arroyo Seco carry?

About 1,086 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is NM-581 over Arroyo Seco?

The structure is 121 ft (37 m) long with a longest span of 33 ft (10 m) and a deck 33 ft wide.

Who owns NM-581 over Arroyo Seco?

It is owned by the State Highway Agency.