US Bridges

NM-209 over Tejano Creek

Fair

Quay County, New Mexico · 14.0 MI S of JCT LOOP-36 · Structure no. 000000000009704

Built
2015
10 years old
Condition
Fair
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
192 ft
1 main span
Daily traffic
588
2018 count
Owner
State
State Highway Agency

About this bridge

NM-209 over Tejano Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying NM-209 over Tejano Creek in Quay County, New Mexico. It was built in 2015, so it is 10 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 588 vehicles a day, roughly 7% of them trucks, projected to reach 543 by 2038. The structure is 192 ft (58.5 m) long and 39 ft wide. If it were closed, the detour would be 47.2 mi (76 km).

CarriesNM-209
CrossesTejano Creek
Location14.0 MI S of JCT LOOP-36
RouteState Highway 209
Coordinates34.97738, -103.75113
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92.7 US tons
Inventory rating51.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length192 ft (58.5 m)
Longest span93 ft (28.3 m)
Deck width39 ft (11.9 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic588 (2018)
Projected traffic543 by 2038
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed47.2 mi (76 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NM-209 over Tejano Creek built?

It was built in 2015, making it 10 years old in 2025.

What condition is NM-209 over Tejano Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does NM-209 over Tejano Creek carry?

About 588 vehicles per day (2018 count), of which roughly 7% are trucks.

How long is NM-209 over Tejano Creek?

The structure is 192 ft (58.5 m) long with a longest span of 93 ft (28.3 m) and a deck 39 ft wide.

Who owns NM-209 over Tejano Creek?

It is owned by the State Highway Agency.