US Bridges

I-40 Ebl over Blanco Creek

Fair

Quay County, New Mexico · 47.2 MI E of JCT US-84 · Structure no. 000000000005954

Built
1958
67 years old
Condition
Fair
inspected April 2023
Type
Slab
Concrete Continuous
Length
184 ft
6 main spans
Daily traffic
21,451
2023 count
Owner
State
State Highway Agency

About this bridge

I-40 Ebl over Blanco Creek is a concrete continuous slab carrying I-40 Ebl over Blanco Creek in Quay County, New Mexico. It was built in 1958, so it is 67 years old, older than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 21,451 vehicles a day, roughly 45% of them trucks, projected to reach 29,173 by 2043. The structure is 184 ft (56.1 m) long and 45 ft wide.

CarriesI-40 Ebl
CrossesBlanco Creek
Location47.2 MI E of JCT US-84
RouteInterstate 40
Coordinates35.11833, -103.86532
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating35.3 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length184 ft (56.1 m)
Longest span30 ft (9.1 m)
Deck width45 ft (13.7 m)
Roadway width42 ft (12.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,451 (2023)
Projected traffic29,173 by 2043
Trucks45%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-40 Ebl over Blanco Creek built?

It was built in 1958, making it 67 years old in 2025.

What condition is I-40 Ebl over Blanco Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does I-40 Ebl over Blanco Creek carry?

About 21,451 vehicles per day (2023 count), of which roughly 45% are trucks.

How long is I-40 Ebl over Blanco Creek?

The structure is 184 ft (56.1 m) long with a longest span of 30 ft (9.1 m) and a deck 45 ft wide.

Who owns I-40 Ebl over Blanco Creek?

It is owned by the State Highway Agency.