IRR BIA RTE 4 over Inn of Mtn Gods Acc Road
GoodOtero County, New Mexico · At Inn of the Mtn Gods · Structure no. 0000M60702B0704
- Built
- 2023
- 2 years old, rebuilt 9999
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 91 ft
- 1 main span
- Daily traffic
- 900
- 2023 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 4 over Inn of Mtn Gods Acc Road is a prestressed concrete stringer/multi-beam or girder carrying IRR BIA RTE 4 over Inn of Mtn Gods Acc Road in Otero County, New Mexico. It was built in 2023 and reconstructed in 9999, so it is 2 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 900 vehicles a day, roughly 10% of them trucks. The structure is 91 ft (27.7 m) long and 47 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 4 over Inn of Mtn Gods Acc Road built?
It was built in 2023, making it 2 years old in 2025. It was reconstructed in 9999.
What condition is IRR BIA RTE 4 over Inn of Mtn Gods Acc Road in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does IRR BIA RTE 4 over Inn of Mtn Gods Acc Road carry?
About 900 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is IRR BIA RTE 4 over Inn of Mtn Gods Acc Road?
The structure is 91 ft (27.7 m) long with a longest span of 88 ft (26.8 m) and a deck 47 ft wide.
Who owns IRR BIA RTE 4 over Inn of Mtn Gods Acc Road?
It is owned by the Bureau of Indian Affairs.