US Bridges

Rocky Canyon Road over Puerco River

Good

McKinley County, New Mexico · 3.5MILES N of Mariano Lak · Structure no. 0000N34780B0494

Built
2020
5 years old
Condition
Good
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
93 ft
1 main span
Daily traffic
213
2018 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

Rocky Canyon Road over Puerco River is a prestressed concrete box beam or girders - multiple carrying Rocky Canyon Road over Puerco River in McKinley County, New Mexico. It was built in 2020, so it is 5 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 213 vehicles a day, roughly 6% of them trucks, projected to reach 287 by 2033. The structure is 93 ft (28.3 m) long and 34 ft wide. If it were closed, the detour would be 41 mi (66 km).

CarriesRocky Canyon Road
CrossesPuerco River
Location3.5MILES N of Mariano Lak
RouteFederal Lands Road 0N11
Coordinates35.61139, -108.31444
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.2 US tons
Inventory rating37.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length93 ft (28.3 m)
Longest span90 ft (27.4 m)
Deck width34 ft (10.5 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic213 (2018)
Projected traffic287 by 2033
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed41 mi (66 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rocky Canyon Road over Puerco River built?

It was built in 2020, making it 5 years old in 2025.

What condition is Rocky Canyon Road over Puerco River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Rocky Canyon Road over Puerco River carry?

About 213 vehicles per day (2018 count), of which roughly 6% are trucks.

How long is Rocky Canyon Road over Puerco River?

The structure is 93 ft (28.3 m) long with a longest span of 90 ft (27.4 m) and a deck 34 ft wide.

Who owns Rocky Canyon Road over Puerco River?

It is owned by the Bureau of Indian Affairs.