US Bridges

31-Z001 over Rio Puerco

Good

McKinley County, New Mexico · 0.3 MI W of NM-118 · Structure no. 000000000008847

Built
1994
31 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
183 ft
2 main spans
Daily traffic
988
2023 count
Owner
County
County Highway Agency

About this bridge

31-Z001 over Rio Puerco is a prestressed concrete continuous stringer/multi-beam or girder carrying 31-Z001 over Rio Puerco in McKinley County, New Mexico. It was built in 1994, so it is 31 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 988 vehicles a day, roughly 11% of them trucks, projected to reach 1,343 by 2043. The structure is 183 ft (55.8 m) long and 37 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

Carries31-Z001
CrossesRio Puerco
Location0.3 MI W of NM-118
RouteCounty Highway 31001
Coordinates35.4903, -108.9056
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length183 ft (55.8 m)
Longest span90 ft (27.4 m)
Deck width37 ft (11.3 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic988 (2023)
Projected traffic1,343 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 31-Z001 over Rio Puerco built?

It was built in 1994, making it 31 years old in 2025.

What condition is 31-Z001 over Rio Puerco in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does 31-Z001 over Rio Puerco carry?

About 988 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is 31-Z001 over Rio Puerco?

The structure is 183 ft (55.8 m) long with a longest span of 90 ft (27.4 m) and a deck 37 ft wide.

Who owns 31-Z001 over Rio Puerco?

It is owned by the County Highway Agency.