I-40 Wbl over NM118 BNSF RR Rio Puerco
FairMcKinley County, New Mexico · 5.0 MI E of US-491 · Structure no. 000000000007871
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 827 ft
- 10 main spans
- Daily traffic
- 24,240
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-40 Wbl over NM118 BNSF RR Rio Puerco is a prestressed concrete stringer/multi-beam or girder carrying I-40 Wbl over NM118 BNSF RR Rio Puerco in McKinley County, New Mexico. It was built in 1980, so it is 45 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 24,240 vehicles a day, roughly 14% of them trucks, projected to reach 32,966 by 2043. The structure is 827 ft (252.1 m) long and 52 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40 Wbl over NM118 BNSF RR Rio Puerco built?
It was built in 1980, making it 45 years old in 2025.
What condition is I-40 Wbl over NM118 BNSF RR Rio Puerco in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does I-40 Wbl over NM118 BNSF RR Rio Puerco carry?
About 24,240 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is I-40 Wbl over NM118 BNSF RR Rio Puerco?
The structure is 827 ft (252.1 m) long with a longest span of 93 ft (28.3 m) and a deck 52 ft wide.
Who owns I-40 Wbl over NM118 BNSF RR Rio Puerco?
It is owned by the State Highway Agency.