31-0012 over Rio Nutria
FairPosted for loadMcKinley County, New Mexico · 7.60 MI SE of Mcgaffey · Structure no. 000000000004301
- Built
- 1920
- 105 years old, rebuilt 1973
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 21 ft
- 1 main span
- Daily traffic
- 337
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
31-0012 over Rio Nutria is a steel stringer/multi-beam or girder carrying 31-0012 over Rio Nutria in McKinley County, New Mexico. It was built in 1920 and reconstructed in 1973, so it is 105 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 337 vehicles a day, projected to reach 458 by 2043. The structure is 21 ft (6.3 m) long and 14 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 31-0012 over Rio Nutria built?
It was built in 1920, making it 105 years old in 2025. It was reconstructed in 1973.
What condition is 31-0012 over Rio Nutria in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does 31-0012 over Rio Nutria carry?
About 337 vehicles per day (2023 count).
How long is 31-0012 over Rio Nutria?
The structure is 21 ft (6.3 m) long with a longest span of 19 ft (5.8 m) and a deck 14 ft wide.
Who owns 31-0012 over Rio Nutria?
It is owned by the County Highway Agency.