US Bridges

I-10 Ebl over NM-418

Fair

Luna County, New Mexico · 14.1 MI E Grant/Luna Cl · Structure no. 000000000006393

Built
1964
61 years old
Condition
Fair
inspected June 2023
Type
Slab
Concrete Continuous
Length
94 ft
3 main spans
Daily traffic
17,321
2023 count
Owner
State
State Highway Agency

About this bridge

I-10 Ebl over NM-418 is a concrete continuous slab carrying I-10 Ebl over NM-418 in Luna County, New Mexico. It was built in 1964, so it is 61 years old, older than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 17,321 vehicles a day, roughly 45% of them trucks, projected to reach 23,556 by 2043. The structure is 94 ft (28.7 m) long and 42 ft wide.

CarriesI-10 Ebl
CrossesNM-418
Location14.1 MI E Grant/Luna Cl
RouteInterstate 10
Coordinates32.24118, -107.99345
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.8 US tons
Inventory rating35.1 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length94 ft (28.7 m)
Longest span36 ft (11 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (11.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,321 (2023)
Projected traffic23,556 by 2043
Trucks45%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-10 Ebl over NM-418 built?

It was built in 1964, making it 61 years old in 2025.

What condition is I-10 Ebl over NM-418 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does I-10 Ebl over NM-418 carry?

About 17,321 vehicles per day (2023 count), of which roughly 45% are trucks.

How long is I-10 Ebl over NM-418?

The structure is 94 ft (28.7 m) long with a longest span of 36 ft (11 m) and a deck 42 ft wide.

Who owns I-10 Ebl over NM-418?

It is owned by the State Highway Agency.