I-40 Ebl over Union Pacific Railroad
FairGuadalupe County, New Mexico · 19.5 M E JCT I-40/US-84 · Structure no. 000000000007191
- Built
- 1972
- 53 years old, rebuilt 2005
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 225 ft
- 3 main spans
- Daily traffic
- 20,120
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-40 Ebl over Union Pacific Railroad is a prestressed concrete stringer/multi-beam or girder carrying I-40 Ebl over Union Pacific Railroad in Guadalupe County, New Mexico. It was built in 1972 and reconstructed in 2005, so it is 53 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 20,120 vehicles a day, roughly 45% of them trucks, projected to reach 27,363 by 2043. The structure is 225 ft (68.6 m) long and 45 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40 Ebl over Union Pacific Railroad built?
It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2005.
What condition is I-40 Ebl over Union Pacific Railroad in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does I-40 Ebl over Union Pacific Railroad carry?
About 20,120 vehicles per day (2023 count), of which roughly 45% are trucks.
How long is I-40 Ebl over Union Pacific Railroad?
The structure is 225 ft (68.6 m) long with a longest span of 88 ft (26.8 m) and a deck 45 ft wide.
Who owns I-40 Ebl over Union Pacific Railroad?
It is owned by the State Highway Agency.