NM-15 over Gila River
FairGrant County, New Mexico · 12.5 M N JCT NM-35/NM-15 · Structure no. 000000000006395
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 177 ft
- 3 main spans
- Daily traffic
- 226
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
NM-15 over Gila River is a steel stringer/multi-beam or girder carrying NM-15 over Gila River in Grant County, New Mexico. It was built in 1963, so it is 62 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 226 vehicles a day, roughly 10% of them trucks, projected to reach 307 by 2043. The structure is 177 ft (53.9 m) long and 28 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NM-15 over Gila River built?
It was built in 1963, making it 62 years old in 2025.
What condition is NM-15 over Gila River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does NM-15 over Gila River carry?
About 226 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is NM-15 over Gila River?
The structure is 177 ft (53.9 m) long with a longest span of 57 ft (17.4 m) and a deck 28 ft wide.
Who owns NM-15 over Gila River?
It is owned by the State Highway Agency.