US Bridges

NM-90 over Pinos Altos Creek

Poor

Grant County, New Mexico · 0.3 MI W US-180/SILVERCTY · Structure no. 000000000006328

Built
1961
64 years old
Condition
Poor
inspected March 2024
Type
Culvert
Concrete
Length
26 ft
2 main spans
Daily traffic
14,699
2023 count
Owner
State
State Highway Agency

About this bridge

NM-90 over Pinos Altos Creek is a concrete culvert carrying NM-90 over Pinos Altos Creek in Grant County, New Mexico. It was built in 1961, so it is 64 years old, older than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 14,699 vehicles a day, roughly 5% of them trucks, projected to reach 19,990 by 2043. The structure is 26 ft (7.9 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNM-90
CrossesPinos Altos Creek
Location0.3 MI W US-180/SILVERCTY
RouteState Highway 90
Coordinates32.77557, -108.27418
Functional classUrban Minor Arterial

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.2 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,699 (2023)
Projected traffic19,990 by 2043
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$274,000 (2030 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was NM-90 over Pinos Altos Creek built?

It was built in 1961, making it 64 years old in 2025.

What condition is NM-90 over Pinos Altos Creek in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in March 2024.

How much traffic does NM-90 over Pinos Altos Creek carry?

About 14,699 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is NM-90 over Pinos Altos Creek?

The structure is 26 ft (7.9 m) long with a longest span of 10 ft (3 m).

Who owns NM-90 over Pinos Altos Creek?

It is owned by the State Highway Agency.