US Bridges

Training Area RD over HWY 54 7 RR

Good

Dona Ana County, New Mexico · HWY 54 Overpass · Structure no. DAPTRABLI007832

Built
2013
12 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
937 ft
10 main spans
Daily traffic
100
2022 count
Owner
Federal
Army

About this bridge

Training Area RD over HWY 54 7 RR is a prestressed concrete stringer/multi-beam or girder carrying Training Area RD over HWY 54 7 RR in Dona Ana County, New Mexico. It was built in 2013, so it is 12 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, projected to reach 400 by 2046. The structure is 937 ft (285.6 m) long and 31 ft wide.

CarriesTraining Area RD
CrossesHWY 54 7 RR
LocationHWY 54 Overpass
Coordinates32.26986, -106.1525
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating69.3 US tons
Inventory rating53.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans10
Design loadHS 25 or greater
Structure length937 ft (285.6 m)
Longest span100 ft (30.5 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2022)
Projected traffic400 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerArmy
Maintained byArmy
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$2,000 (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Training Area RD over HWY 54 7 RR built?

It was built in 2013, making it 12 years old in 2025.

What condition is Training Area RD over HWY 54 7 RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Training Area RD over HWY 54 7 RR carry?

About 100 vehicles per day (2022 count).

How long is Training Area RD over HWY 54 7 RR?

The structure is 937 ft (285.6 m) long with a longest span of 100 ft (30.5 m) and a deck 31 ft wide.

Who owns Training Area RD over HWY 54 7 RR?

It is owned by the Army.