US Bridges

HWY 213 over Drainage Ditch

Good

Dona Ana County, New Mexico · Dona Ana Range RD HWY 213 · Structure no. DAPTRABLI000005

Built
1941
84 years old
Condition
Good
inspected July 2024
Type
Culvert
Steel
Length
20 ft
3 main spans
Daily traffic
600
2022 count
Owner
Federal
Army

About this bridge

HWY 213 over Drainage Ditch is a steel culvert carrying HWY 213 over Drainage Ditch in Dona Ana County, New Mexico. It was built in 1941, so it is 84 years old, older than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 600 vehicles a day, roughly 15% of them trucks, projected to reach 800 by 2046. The structure is 20 ft (6.2 m) long.

CarriesHWY 213
CrossesDrainage Ditch
LocationDona Ana Range RD HWY 213
Coordinates32.17607, -106.4506
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating107.1 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans3
Design loadUnknown
Structure length20 ft (6.2 m)
Longest span5 ft (1.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic600 (2022)
Projected traffic800 by 2046
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerArmy
Maintained byArmy
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$2,000 (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY 213 over Drainage Ditch built?

It was built in 1941, making it 84 years old in 2025.

What condition is HWY 213 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does HWY 213 over Drainage Ditch carry?

About 600 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is HWY 213 over Drainage Ditch?

The structure is 20 ft (6.2 m) long with a longest span of 5 ft (1.6 m).

Who owns HWY 213 over Drainage Ditch?

It is owned by the Army.