US Bridges

Boxter Way over Alameda Arroyo

Good

Dona Ana County, New Mexico · 0.1 M N Bently Drive · Structure no. 000000000009764

Built
2006
19 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
20 ft
2 main spans
Daily traffic
319
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Boxter Way over Alameda Arroyo is a concrete culvert carrying Boxter Way over Alameda Arroyo in Dona Ana County, New Mexico. It was built in 2006, so it is 19 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 319 vehicles a day, projected to reach 433 by 2043. The structure is 20 ft (6.2 m) long.

CarriesBoxter Way
CrossesAlameda Arroyo
Location0.1 M N Bently Drive
RouteCity Street 13
Coordinates32.34203, -106.77146
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length20 ft (6.2 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic319 (2023)
Projected traffic433 by 2043
Trucks—
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Boxter Way over Alameda Arroyo built?

It was built in 2006, making it 19 years old in 2025.

What condition is Boxter Way over Alameda Arroyo in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Boxter Way over Alameda Arroyo carry?

About 319 vehicles per day (2023 count).

How long is Boxter Way over Alameda Arroyo?

The structure is 20 ft (6.2 m) long with a longest span of 10 ft (3 m).

Who owns Boxter Way over Alameda Arroyo?

It is owned by the City or Municipal Highway Agency.