US Bridges

I-10 Ebl over NM-28

Good

Dona Ana County, New Mexico · 5.7 M E of I-10 Exit 135 · Structure no. 000000000009610

Built
2015
10 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
124 ft
1 main span
Daily traffic
29,541
2023 count
Owner
State
State Highway Agency

About this bridge

I-10 Ebl over NM-28 is a prestressed concrete stringer/multi-beam or girder carrying I-10 Ebl over NM-28 in Dona Ana County, New Mexico. It was built in 2015, so it is 10 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 29,541 vehicles a day, roughly 14% of them trucks, projected to reach 40,175 by 2043. The structure is 124 ft (37.8 m) long and 41 ft wide.

CarriesI-10 Ebl
CrossesNM-28
Location5.7 M E of I-10 Exit 135
RouteInterstate 10
Coordinates32.28961, -106.79069
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating103.5 US tons
Inventory rating54.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length124 ft (37.8 m)
Longest span122 ft (37.1 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,541 (2023)
Projected traffic40,175 by 2043
Trucks14%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-10 Ebl over NM-28 built?

It was built in 2015, making it 10 years old in 2025.

What condition is I-10 Ebl over NM-28 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does I-10 Ebl over NM-28 carry?

About 29,541 vehicles per day (2023 count), of which roughly 14% are trucks.

How long is I-10 Ebl over NM-28?

The structure is 124 ft (37.8 m) long with a longest span of 122 ft (37.1 m) and a deck 41 ft wide.

Who owns I-10 Ebl over NM-28?

It is owned by the State Highway Agency.