US Bridges

FR-2184 over I-25 NB and SB

Good

Colfax County, New Mexico · 8.4 M Nof Jct. 64/87 · Structure no. 000000000009772

Built
2022
3 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
100 ft
1 main span
Daily traffic
77
2016 count
Owner
State
State Highway Agency

About this bridge

FR-2184 over I-25 NB and SB is a prestressed concrete stringer/multi-beam or girder carrying FR-2184 over I-25 NB and SB in Colfax County, New Mexico. It was built in 2022, so it is 3 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 77 vehicles a day, roughly 14% of them trucks, projected to reach 93 by 2036. The structure is 100 ft (30.5 m) long and 35 ft wide.

CarriesFR-2184
CrossesI-25 NB and SB
Location8.4 M Nof Jct. 64/87
RouteCounty Highway 2184
Coordinates36.98708, -104.48417
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.4 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length100 ft (30.5 m)
Longest span100 ft (30.5 m)
Deck width35 ft (10.7 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic77 (2016)
Projected traffic93 by 2036
Trucks14%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed—
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FR-2184 over I-25 NB and SB built?

It was built in 2022, making it 3 years old in 2025.

What condition is FR-2184 over I-25 NB and SB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does FR-2184 over I-25 NB and SB carry?

About 77 vehicles per day (2016 count), of which roughly 14% are trucks.

How long is FR-2184 over I-25 NB and SB?

The structure is 100 ft (30.5 m) long with a longest span of 100 ft (30.5 m) and a deck 35 ft wide.

Who owns FR-2184 over I-25 NB and SB?

It is owned by the State Highway Agency.