US-64 over Una De Gato Creeek
FairColfax County, New Mexico · 10.7 MI E of I-25/RATON · Structure no. 000000000009564
- Built
- 2012
- 13 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 192 ft
- 2 main spans
- Daily traffic
- 5,574
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US-64 over Una De Gato Creeek is a prestressed concrete continuous stringer/multi-beam or girder carrying US-64 over Una De Gato Creeek in Colfax County, New Mexico. It was built in 2012, so it is 13 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,574 vehicles a day, roughly 14% of them trucks, projected to reach 7,580 by 2043. The structure is 192 ft (58.5 m) long and 41 ft wide. If it were closed, the detour would be 100 mi (161 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US-64 over Una De Gato Creeek built?
It was built in 2012, making it 13 years old in 2025.
What condition is US-64 over Una De Gato Creeek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does US-64 over Una De Gato Creeek carry?
About 5,574 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is US-64 over Una De Gato Creeek?
The structure is 192 ft (58.5 m) long with a longest span of 94 ft (28.5 m) and a deck 41 ft wide.
Who owns US-64 over Una De Gato Creeek?
It is owned by the State Highway Agency.