US Bridges

FR-4032 over I-40 Ebl & Wbl

Good

Cibola County, New Mexico · I-40 Exit 104 Seama Intch · Structure no. 000000000009261

Built
2008
17 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
236 ft
2 main spans
Daily traffic
598
2023 count
Owner
State
State Highway Agency

About this bridge

FR-4032 over I-40 Ebl & Wbl is a prestressed concrete continuous stringer/multi-beam or girder carrying FR-4032 over I-40 Ebl & Wbl in Cibola County, New Mexico. It was built in 2008, so it is 17 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 598 vehicles a day, roughly 11% of them trucks, projected to reach 813 by 2043. The structure is 236 ft (71.9 m) long and 39 ft wide.

CarriesFR-4032
CrossesI-40 Ebl & Wbl
LocationI-40 Exit 104 Seama Intch
RouteState Highway 4032
Coordinates35.05603, -107.52176
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating89.9 US tons
Inventory rating54 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length236 ft (71.9 m)
Longest span118 ft (36 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic598 (2023)
Projected traffic813 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FR-4032 over I-40 Ebl & Wbl built?

It was built in 2008, making it 17 years old in 2025.

What condition is FR-4032 over I-40 Ebl & Wbl in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does FR-4032 over I-40 Ebl & Wbl carry?

About 598 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is FR-4032 over I-40 Ebl & Wbl?

The structure is 236 ft (71.9 m) long with a longest span of 118 ft (36 m) and a deck 39 ft wide.

Who owns FR-4032 over I-40 Ebl & Wbl?

It is owned by the State Highway Agency.