US Bridges

US-82 over Graveyard Canyon

Good

Chaves County, New Mexico · 8.6 MI W JCT NM-24/DUNKEN · Structure no. 000000000006891

Built
1967
58 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
24 ft
2 main spans
Daily traffic
749
2023 count
Owner
State
State Highway Agency

About this bridge

US-82 over Graveyard Canyon is a concrete culvert carrying US-82 over Graveyard Canyon in Chaves County, New Mexico. It was built in 1967, so it is 58 years old, older than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 749 vehicles a day, roughly 11% of them trucks, projected to reach 1,018 by 2043. The structure is 24 ft (7.3 m) long. If it were closed, the detour would be 98.8 mi (159 km).

CarriesUS-82
CrossesGraveyard Canyon
Location8.6 MI W JCT NM-24/DUNKEN
RouteU.S. Route 82
Coordinates32.93815, -105.2769
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.8 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length24 ft (7.3 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic749 (2023)
Projected traffic1,018 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US-82 over Graveyard Canyon built?

It was built in 1967, making it 58 years old in 2025.

What condition is US-82 over Graveyard Canyon in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does US-82 over Graveyard Canyon carry?

About 749 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is US-82 over Graveyard Canyon?

The structure is 24 ft (7.3 m) long with a longest span of 12 ft (3.7 m).

Who owns US-82 over Graveyard Canyon?

It is owned by the State Highway Agency.