US-180 over South Dugway Canyon
FairCatron County, New Mexico · 3.0 M NW Grant/Catron Cl · Structure no. 000000000007665
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 186 ft
- 3 main spans
- Daily traffic
- 962
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US-180 over South Dugway Canyon is a steel stringer/multi-beam or girder carrying US-180 over South Dugway Canyon in Catron County, New Mexico. It was built in 1977, so it is 48 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 962 vehicles a day, roughly 11% of them trucks, projected to reach 1,308 by 2043. The structure is 186 ft (56.7 m) long and 41 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US-180 over South Dugway Canyon built?
It was built in 1977, making it 48 years old in 2025.
What condition is US-180 over South Dugway Canyon in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does US-180 over South Dugway Canyon carry?
About 962 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is US-180 over South Dugway Canyon?
The structure is 186 ft (56.7 m) long with a longest span of 141 ft (43 m) and a deck 41 ft wide.
Who owns US-180 over South Dugway Canyon?
It is owned by the State Highway Agency.