I-40 Ebl over North Diversion Channel
FairBernalillo County, New Mexico · 1.0 Mi. E JCT I-25 & I-40 · Structure no. 000000000009926
- Built
- 2003
- 22 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 188 ft
- 2 main spans
- Daily traffic
- 160,467
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-40 Ebl over North Diversion Channel is a prestressed concrete stringer/multi-beam or girder carrying I-40 Ebl over North Diversion Channel in Bernalillo County, New Mexico. It was built in 2003, so it is 22 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 160,467 vehicles a day, roughly 14% of them trucks, projected to reach 218,235 by 2043. The structure is 188 ft (57.3 m) long and 95 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40 Ebl over North Diversion Channel built?
It was built in 2003, making it 22 years old in 2025.
What condition is I-40 Ebl over North Diversion Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does I-40 Ebl over North Diversion Channel carry?
About 160,467 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is I-40 Ebl over North Diversion Channel?
The structure is 188 ft (57.3 m) long with a longest span of 100 ft (30.5 m) and a deck 95 ft wide.
Who owns I-40 Ebl over North Diversion Channel?
It is owned by the State Highway Agency.