I-40 Wbl over Edith Blvd.
GoodBernalillo County, New Mexico · Junction I-25 and I-40 · Structure no. 000000000009919
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 90 ft
- 1 main span
- Daily traffic
- 136,306
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-40 Wbl over Edith Blvd. is a prestressed concrete stringer/multi-beam or girder carrying I-40 Wbl over Edith Blvd. in Bernalillo County, New Mexico. It was built in 2003, so it is 22 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 136,306 vehicles a day, roughly 14% of them trucks, projected to reach 185,376 by 2043. The structure is 90 ft (27.3 m) long and 120 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40 Wbl over Edith Blvd. built?
It was built in 2003, making it 22 years old in 2025.
What condition is I-40 Wbl over Edith Blvd. in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does I-40 Wbl over Edith Blvd. carry?
About 136,306 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is I-40 Wbl over Edith Blvd.?
The structure is 90 ft (27.3 m) long with a longest span of 90 ft (27.3 m) and a deck 120 ft wide.
Who owns I-40 Wbl over Edith Blvd.?
It is owned by the State Highway Agency.