FL-4065 over Tijeras Arroyo
FairBernalillo County, New Mexico · 1.0 MI S of Central Ave. · Structure no. 000000000009358
- Built
- 2007
- 18 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 286 ft
- 3 main spans
- Daily traffic
- 14,661
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FL-4065 over Tijeras Arroyo is a prestressed concrete stringer/multi-beam or girder carrying FL-4065 over Tijeras Arroyo in Bernalillo County, New Mexico. It was built in 2007, so it is 18 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,661 vehicles a day, roughly 5% of them trucks, projected to reach 19,938 by 2043. The structure is 286 ft (87.2 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FL-4065 over Tijeras Arroyo built?
It was built in 2007, making it 18 years old in 2025.
What condition is FL-4065 over Tijeras Arroyo in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does FL-4065 over Tijeras Arroyo carry?
About 14,661 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is FL-4065 over Tijeras Arroyo?
The structure is 286 ft (87.2 m) long with a longest span of 100 ft (30.5 m) and a deck 74 ft wide.
Who owns FL-4065 over Tijeras Arroyo?
It is owned by the City or Municipal Highway Agency.