US Bridges

FL-4063 over I-40 Eb/Wb/Embudo Arroyo

Good

Bernalillo County, New Mexico · 5.3 M E I-25/I-40 · Structure no. 000000000008924

Built
1996
29 years old
Condition
Good
inspected August 2024
Type
Box Beam or Girders - Single or Spread
Steel Continuous
Length
328 ft
4 main spans
Daily traffic
50,592
2023 count
Owner
State
State Highway Agency

About this bridge

FL-4063 over I-40 Eb/Wb/Embudo Arroyo is a steel continuous box beam or girders - single or spread carrying FL-4063 over I-40 Eb/Wb/Embudo Arroyo in Bernalillo County, New Mexico. It was built in 1996, so it is 29 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50,592 vehicles a day, roughly 13% of them trucks, projected to reach 68,805 by 2043. The structure is 328 ft (100 m) long and 114 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFL-4063
CrossesI-40 Eb/Wb/Embudo Arroyo
Location5.3 M E I-25/I-40
RouteCity Street 4063
Coordinates35.08322, -106.53232
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length328 ft (100 m)
Longest span117 ft (35.7 m)
Deck width114 ft (34.7 m)
Roadway width75 ft (22.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50,592 (2023)
Projected traffic68,805 by 2043
Trucks13%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FL-4063 over I-40 Eb/Wb/Embudo Arroyo built?

It was built in 1996, making it 29 years old in 2025.

What condition is FL-4063 over I-40 Eb/Wb/Embudo Arroyo in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does FL-4063 over I-40 Eb/Wb/Embudo Arroyo carry?

About 50,592 vehicles per day (2023 count), of which roughly 13% are trucks.

How long is FL-4063 over I-40 Eb/Wb/Embudo Arroyo?

The structure is 328 ft (100 m) long with a longest span of 117 ft (35.7 m) and a deck 114 ft wide.

Who owns FL-4063 over I-40 Eb/Wb/Embudo Arroyo?

It is owned by the State Highway Agency.