US Bridges

FL-5128 over Amole Del Norte Divr-Chl

Fair

Bernalillo County, New Mexico · 0.18 MI W of Bridge Blvd · Structure no. 000000000008892

Built
1992
33 years old
Condition
Fair
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
36 ft
1 main span
Daily traffic
319
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

FL-5128 over Amole Del Norte Divr-Chl is a prestressed concrete box beam or girders - multiple carrying FL-5128 over Amole Del Norte Divr-Chl in Bernalillo County, New Mexico. It was built in 1992, so it is 33 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 319 vehicles a day, projected to reach 433 by 2043. The structure is 36 ft (11 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFL-5128
CrossesAmole Del Norte Divr-Chl
Location0.18 MI W of Bridge Blvd
RouteCity Street 5128
Coordinates35.07026, -106.71493
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length36 ft (11 m)
Longest span34 ft (10.4 m)
Deck width60 ft (18.3 m)
Roadway width44 ft (13.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic319 (2023)
Projected traffic433 by 2043
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FL-5128 over Amole Del Norte Divr-Chl built?

It was built in 1992, making it 33 years old in 2025.

What condition is FL-5128 over Amole Del Norte Divr-Chl in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does FL-5128 over Amole Del Norte Divr-Chl carry?

About 319 vehicles per day (2023 count).

How long is FL-5128 over Amole Del Norte Divr-Chl?

The structure is 36 ft (11 m) long with a longest span of 34 ft (10.4 m) and a deck 60 ft wide.

Who owns FL-5128 over Amole Del Norte Divr-Chl?

It is owned by the City or Municipal Highway Agency.