US Bridges

FL-5041 over North Pino Arroyo

Fair

Bernalillo County, New Mexico · 0.68 MI N of Academy Blvd · Structure no. 000000000008483

Built
1985
40 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete
Length
26 ft
1 main span
Daily traffic
10,701
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

FL-5041 over North Pino Arroyo is a concrete culvert carrying FL-5041 over North Pino Arroyo in Bernalillo County, New Mexico. It was built in 1985, so it is 40 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,701 vehicles a day, roughly 5% of them trucks, projected to reach 14,553 by 2043. The structure is 26 ft (7.9 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFL-5041
CrossesNorth Pino Arroyo
Location0.68 MI N of Academy Blvd
RouteCity Street 5041
Coordinates35.16054, -106.54218
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span22 ft (6.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,701 (2023)
Projected traffic14,553 by 2043
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FL-5041 over North Pino Arroyo built?

It was built in 1985, making it 40 years old in 2025.

What condition is FL-5041 over North Pino Arroyo in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does FL-5041 over North Pino Arroyo carry?

About 10,701 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is FL-5041 over North Pino Arroyo?

The structure is 26 ft (7.9 m) long with a longest span of 22 ft (6.7 m).

Who owns FL-5041 over North Pino Arroyo?

It is owned by the City or Municipal Highway Agency.