FL-4018 over R/R Spur Removed
FairBernalillo County, New Mexico · 0.4 MI W of JCT I-25 · Structure no. 000000000008200
- Built
- 1973
- 52 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 91 ft
- 1 main span
- Daily traffic
- 25,457
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FL-4018 over R/R Spur Removed is a prestressed concrete stringer/multi-beam or girder carrying FL-4018 over R/R Spur Removed in Bernalillo County, New Mexico. It was built in 1973, so it is 52 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25,457 vehicles a day, roughly 12% of them trucks, projected to reach 34,621 by 2043. The structure is 91 ft (27.7 m) long and 50 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FL-4018 over R/R Spur Removed built?
It was built in 1973, making it 52 years old in 2025.
What condition is FL-4018 over R/R Spur Removed in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does FL-4018 over R/R Spur Removed carry?
About 25,457 vehicles per day (2023 count), of which roughly 12% are trucks.
How long is FL-4018 over R/R Spur Removed?
The structure is 91 ft (27.7 m) long with a longest span of 87 ft (26.5 m) and a deck 50 ft wide.
Who owns FL-4018 over R/R Spur Removed?
It is owned by the City or Municipal Highway Agency.