I-40 Ebl over Tijeras Arroyo
FairBernalillo County, New Mexico · 11.6 MI E JCT I-25/I-40 · Structure no. 000000000007640
- Built
- 1978
- 47 years old, rebuilt 2007
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 198 ft
- 3 main spans
- Daily traffic
- 50,642
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-40 Ebl over Tijeras Arroyo is a prestressed concrete stringer/multi-beam or girder carrying I-40 Ebl over Tijeras Arroyo in Bernalillo County, New Mexico. It was built in 1978 and reconstructed in 2007, so it is 47 years old, younger than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50,642 vehicles a day, roughly 70% of them trucks, projected to reach 68,873 by 2043. The structure is 198 ft (60.4 m) long and 57 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40 Ebl over Tijeras Arroyo built?
It was built in 1978, making it 47 years old in 2025. It was reconstructed in 2007.
What condition is I-40 Ebl over Tijeras Arroyo in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does I-40 Ebl over Tijeras Arroyo carry?
About 50,642 vehicles per day (2023 count), of which roughly 70% are trucks.
How long is I-40 Ebl over Tijeras Arroyo?
The structure is 198 ft (60.4 m) long with a longest span of 64 ft (19.5 m) and a deck 57 ft wide.
Who owns I-40 Ebl over Tijeras Arroyo?
It is owned by the State Highway Agency.