US Bridges

IA-4175 over NM-337

Fair

Bernalillo County, New Mexico · 14.9 MI E JCT I-25/I-40 · Structure no. 000000000007603

Built
1977
48 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
150 ft
3 main spans
Daily traffic
6,923
2023 count
Owner
State
State Highway Agency

About this bridge

IA-4175 over NM-337 is a prestressed concrete stringer/multi-beam or girder carrying IA-4175 over NM-337 in Bernalillo County, New Mexico. It was built in 1977, so it is 48 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,923 vehicles a day, roughly 14% of them trucks, projected to reach 9,415 by 2043. The structure is 150 ft (45.7 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIA-4175
CrossesNM-337
Location14.9 MI E JCT I-25/I-40
RouteInterstate 4175
Coordinates35.08076, -106.38765
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length150 ft (45.7 m)
Longest span58 ft (17.7 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,923 (2023)
Projected traffic9,415 by 2043
Trucks14%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IA-4175 over NM-337 built?

It was built in 1977, making it 48 years old in 2025.

What condition is IA-4175 over NM-337 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does IA-4175 over NM-337 carry?

About 6,923 vehicles per day (2023 count), of which roughly 14% are trucks.

How long is IA-4175 over NM-337?

The structure is 150 ft (45.7 m) long with a longest span of 58 ft (17.7 m) and a deck 27 ft wide.

Who owns IA-4175 over NM-337?

It is owned by the State Highway Agency.