US Bridges

NM-14 over Embudito Canyon

Good

Bernalillo County, New Mexico · 1.7 MI N of JCT I-40 · Structure no. 000000000007551

Built
1976
49 years old
Condition
Good
inspected November 2023
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
11,657
2023 count
Owner
State
State Highway Agency

About this bridge

NM-14 over Embudito Canyon is a concrete culvert carrying NM-14 over Embudito Canyon in Bernalillo County, New Mexico. It was built in 1976, so it is 49 years old, younger than the New Mexico average of 51.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,657 vehicles a day, roughly 1% of them trucks, projected to reach 15,853 by 2043. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 14.9 mi (24 km).

CarriesNM-14
CrossesEmbudito Canyon
Location1.7 MI N of JCT I-40
RouteState Highway 14
Coordinates35.10841, -106.37412
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.9 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,657 (2023)
Projected traffic15,853 by 2043
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.9 mi (24 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NM-14 over Embudito Canyon built?

It was built in 1976, making it 49 years old in 2025.

What condition is NM-14 over Embudito Canyon in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does NM-14 over Embudito Canyon carry?

About 11,657 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is NM-14 over Embudito Canyon?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m).

Who owns NM-14 over Embudito Canyon?

It is owned by the State Highway Agency.