FL-4052( Osuna) EB over North Diversion Channel
FairBernalillo County, New Mexico · 1.1 M W of I-25 / Albuq · Structure no. 000000000007495
- Built
- 1966
- 59 years old, rebuilt 1989
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 101 ft
- 1 main span
- Daily traffic
- 24,282
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FL-4052( Osuna) EB over North Diversion Channel is a prestressed concrete stringer/multi-beam or girder carrying FL-4052( Osuna) EB over North Diversion Channel in Bernalillo County, New Mexico. It was built in 1966 and reconstructed in 1989, so it is 59 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 24,282 vehicles a day, roughly 12% of them trucks, projected to reach 33,023 by 2043. The structure is 101 ft (30.8 m) long and 44 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FL-4052( Osuna) EB over North Diversion Channel built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1989.
What condition is FL-4052( Osuna) EB over North Diversion Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does FL-4052( Osuna) EB over North Diversion Channel carry?
About 24,282 vehicles per day (2023 count), of which roughly 12% are trucks.
How long is FL-4052( Osuna) EB over North Diversion Channel?
The structure is 101 ft (30.8 m) long with a longest span of 99 ft (30.2 m) and a deck 44 ft wide.
Who owns FL-4052( Osuna) EB over North Diversion Channel?
It is owned by the City or Municipal Highway Agency.