I-25 Sbl over North Diversion Channel
GoodBernalillo County, New Mexico · 2.9 MI N of JCT I-25/I-40 · Structure no. 000000000006699
- Built
- 1966
- 59 years old, rebuilt 1992
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 169 ft
- 2 main spans
- Daily traffic
- 160,076
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Sbl over North Diversion Channel is a prestressed concrete stringer/multi-beam or girder carrying I-25 Sbl over North Diversion Channel in Bernalillo County, New Mexico. It was built in 1966 and reconstructed in 1992, so it is 59 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 160,076 vehicles a day, roughly 5% of them trucks, projected to reach 217,703 by 2043. The structure is 169 ft (51.5 m) long and 77 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Sbl over North Diversion Channel built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1992.
What condition is I-25 Sbl over North Diversion Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does I-25 Sbl over North Diversion Channel carry?
About 160,076 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is I-25 Sbl over North Diversion Channel?
The structure is 169 ft (51.5 m) long with a longest span of 82 ft (25 m) and a deck 77 ft wide.
Who owns I-25 Sbl over North Diversion Channel?
It is owned by the State Highway Agency.