I-25 Sbl over Avenida Cesar Chavez
FairBernalillo County, New Mexico · 3.2 M N JCT I-25/NM-500 · Structure no. 000000000006229
- Built
- 1961
- 64 years old, rebuilt 1967
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 184 ft
- 3 main spans
- Daily traffic
- 125,426
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Sbl over Avenida Cesar Chavez is a prestressed concrete stringer/multi-beam or girder carrying I-25 Sbl over Avenida Cesar Chavez in Bernalillo County, New Mexico. It was built in 1961 and reconstructed in 1967, so it is 64 years old, older than the New Mexico average of 51.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 125,426 vehicles a day, roughly 3% of them trucks, projected to reach 170,579 by 2043. The structure is 184 ft (56.1 m) long and 56 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Sbl over Avenida Cesar Chavez built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1967.
What condition is I-25 Sbl over Avenida Cesar Chavez in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does I-25 Sbl over Avenida Cesar Chavez carry?
About 125,426 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is I-25 Sbl over Avenida Cesar Chavez?
The structure is 184 ft (56.1 m) long with a longest span of 90 ft (27.4 m) and a deck 56 ft wide.
Who owns I-25 Sbl over Avenida Cesar Chavez?
It is owned by the State Highway Agency.