Nj 35 over S Br Rahway River
FairUnion County, New Jersey · 0.14 MI S of Rt 27 JCT · Structure no. 2022150
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 54 ft
- 1 main span
- Daily traffic
- 13,732
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Nj 35 over S Br Rahway River is a prestressed concrete box beam or girders - multiple carrying Nj 35 over S Br Rahway River in Union County, New Jersey. It was built in 1968, so it is 57 years old, younger than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,732 vehicles a day, roughly 4% of them trucks, projected to reach 16,755 by 2044. The structure is 54 ft (16.5 m) long and 78 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nj 35 over S Br Rahway River built?
It was built in 1968, making it 57 years old in 2025.
What condition is Nj 35 over S Br Rahway River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Nj 35 over S Br Rahway River carry?
About 13,732 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is Nj 35 over S Br Rahway River?
The structure is 54 ft (16.5 m) long with a longest span of 52 ft (15.8 m) and a deck 78 ft wide.
Who owns Nj 35 over S Br Rahway River?
It is owned by the State Highway Agency.