Main ST CR 511 over Montclair-Boonton Line
FairMorris County, New Jersey · 340FT N CR511 & I287 JCT · Structure no. 1463151
- Built
- 1927
- 98 years old
- Condition
- Fair
- inspected January 2023
- Type
- Girder and Floorbeam System
- Steel
- Length
- 71 ft
- 1 main span
- Daily traffic
- 8,995
- 2023 count
- Owner
- Unknown
- Unknown
About this bridge
Main ST CR 511 over Montclair-Boonton Line is a steel girder and floorbeam system carrying Main ST CR 511 over Montclair-Boonton Line in Morris County, New Jersey. It was built in 1927, so it is 98 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,995 vehicles a day, roughly 4% of them trucks, projected to reach 12,120 by 2043. The structure is 71 ft (21.6 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main ST CR 511 over Montclair-Boonton Line built?
It was built in 1927, making it 98 years old in 2025.
What condition is Main ST CR 511 over Montclair-Boonton Line in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Main ST CR 511 over Montclair-Boonton Line carry?
About 8,995 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is Main ST CR 511 over Montclair-Boonton Line?
The structure is 71 ft (21.6 m) long with a longest span of 65 ft (19.8 m) and a deck 35 ft wide.
Who owns Main ST CR 511 over Montclair-Boonton Line?
It is owned by the Unknown and maintained by the Other State Agency.