US Bridges

Gsp Sbi over Normandy RD & Nad RR

Fair

Monmouth County, New Jersey · 4.83 Mi. N. of GSP/18N Jc · Structure no. 361109E

Built
1972
53 years old
Condition
Fair
inspected July 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
268 ft
4 main spans
Daily traffic
28,399
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

Gsp Sbi over Normandy RD & Nad RR is a prestressed concrete box beam or girders - multiple carrying Gsp Sbi over Normandy RD & Nad RR in Monmouth County, New Jersey. It was built in 1972, so it is 53 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 28,399 vehicles a day, roughly 1% of them trucks, projected to reach 34,652 by 2044. The structure is 268 ft (81.7 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGsp Sbi
CrossesNormandy RD & Nad RR
Location4.83 Mi. N. of GSP/18N Jc
Coordinates40.34443, -74.11135
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.5 US tons
Inventory rating32.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadH 20
Structure length268 ft (81.7 m)
Longest span71 ft (21.6 m)
Deck width41 ft (12.6 m)
Roadway width37 ft (11.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic28,399 (2024)
Projected traffic34,652 by 2044
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Gsp Sbi over Normandy RD & Nad RR built?

It was built in 1972, making it 53 years old in 2025.

What condition is Gsp Sbi over Normandy RD & Nad RR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Gsp Sbi over Normandy RD & Nad RR carry?

About 28,399 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Gsp Sbi over Normandy RD & Nad RR?

The structure is 268 ft (81.7 m) long with a longest span of 71 ft (21.6 m) and a deck 41 ft wide.

Who owns Gsp Sbi over Normandy RD & Nad RR?

It is owned by the State Toll Authority.