US Bridges

Parking Sbi over Newman Springs RD(CR520)

Fair

Monmouth County, New Jersey · 3.96 Mi. N. of GSP/18N Jc · Structure no. 361101E

Built
1972
53 years old
Condition
Fair
inspected May 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
129 ft
3 main spans
Daily traffic
27,840
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

Parking Sbi over Newman Springs RD(CR520) is a prestressed concrete box beam or girders - multiple carrying Parking Sbi over Newman Springs RD(CR520) in Monmouth County, New Jersey. It was built in 1972, so it is 53 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 27,840 vehicles a day, roughly 1% of them trucks, projected to reach 84,989 by 2044. The structure is 129 ft (39.3 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesParking Sbi
CrossesNewman Springs RD(CR520)
Location3.96 Mi. N. of GSP/18N Jc
Coordinates40.3368, -74.10058
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.4 US tons
Inventory rating38.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length129 ft (39.3 m)
Longest span69 ft (21 m)
Deck width41 ft (12.6 m)
Roadway width37 ft (11.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic27,840 (2024)
Projected traffic84,989 by 2044
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$2.2 million (2018 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Parking Sbi over Newman Springs RD(CR520) built?

It was built in 1972, making it 53 years old in 2025.

What condition is Parking Sbi over Newman Springs RD(CR520) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does Parking Sbi over Newman Springs RD(CR520) carry?

About 27,840 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Parking Sbi over Newman Springs RD(CR520)?

The structure is 129 ft (39.3 m) long with a longest span of 69 ft (21 m) and a deck 41 ft wide.

Who owns Parking Sbi over Newman Springs RD(CR520)?

It is owned by the State Toll Authority.