US Bridges

Baldwin Avenue over Conrail & Path

PoorClosed to traffic

Hudson County, New Jersey · 0.4 MI S of Rt 139 · Structure no. 0954163

Built
1917
108 years old, rebuilt 1990
Condition
Poor
inspected July 2024
Type
Girder and Floorbeam System
Steel
Length
166 ft
2 main spans
Daily traffic
38,705
2024 count
Owner
Unknown
Unknown

About this bridge

Baldwin Avenue over Conrail & Path is a steel girder and floorbeam system carrying Baldwin Avenue over Conrail & Path in Hudson County, New Jersey. It was built in 1917 and reconstructed in 1990, so it is 108 years old, older than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.

It carries about 38,705 vehicles a day, roughly 4% of them trucks, projected to reach 46,750 by 2044. The structure is 166 ft (50.6 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBaldwin Avenue
CrossesConrail & Path
Location0.4 MI S of Rt 139
RouteCity Street 0
Coordinates40.72933, -74.05991
Functional classUrban Minor Arterial

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusClosed to all traffic
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating37 US tons
Inventory rating22 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2 (+1 approach)
Design loadUnknown
Structure length166 ft (50.6 m)
Longest span72 ft (21.9 m)
Deck width34 ft (10.3 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic38,705 (2024)
Projected traffic46,750 by 2044
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerUnknown
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$5.9 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Baldwin Avenue over Conrail & Path built?

It was built in 1917, making it 108 years old in 2025. It was reconstructed in 1990.

What condition is Baldwin Avenue over Conrail & Path in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2024.

How much traffic does Baldwin Avenue over Conrail & Path carry?

About 38,705 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is Baldwin Avenue over Conrail & Path?

The structure is 166 ft (50.6 m) long with a longest span of 72 ft (21.9 m) and a deck 34 ft wide.

Who owns Baldwin Avenue over Conrail & Path?

It is owned by the Unknown and maintained by the State Highway Agency.