US Bridges

East Atlantic Ave over Relief for Waterway

Good

Camden County, New Jersey · 0.95 Mi. N. of CR 551 · Structure no. 044B015

Built
2015
10 years old
Condition
Good
inspected June 2023
Type
Frame
Concrete
Length
76 ft
2 main spans
Daily traffic
2,181
2023 count
Owner
County
County Highway Agency

About this bridge

East Atlantic Ave over Relief for Waterway is a concrete frame carrying East Atlantic Ave over Relief for Waterway in Camden County, New Jersey. It was built in 2015, so it is 10 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,181 vehicles a day, roughly 3% of them trucks, projected to reach 2,661 by 2043. The structure is 76 ft (23.2 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEast Atlantic Ave
CrossesRelief for Waterway
Location0.95 Mi. N. of CR 551
RouteCounty Highway 729
Coordinates39.89649, -75.07356
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations on dry land well above flood water elevations
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating106.8 US tons
Inventory rating106.5 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadHL 93
Structure length76 ft (23.2 m)
Longest span30 ft (9.1 m)
Deck width39 ft (12 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,181 (2023)
Projected traffic2,661 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was East Atlantic Ave over Relief for Waterway built?

It was built in 2015, making it 10 years old in 2025.

What condition is East Atlantic Ave over Relief for Waterway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does East Atlantic Ave over Relief for Waterway carry?

About 2,181 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is East Atlantic Ave over Relief for Waterway?

The structure is 76 ft (23.2 m) long with a longest span of 30 ft (9.1 m) and a deck 39 ft wide.

Who owns East Atlantic Ave over Relief for Waterway?

It is owned by the County Highway Agency.