Baird Blvd(co 608) over US 30
PoorCamden County, New Jersey · 0.63 MI S of 30-537 JCT · Structure no. 0406156
- Built
- 1949
- 76 years old
- Condition
- Poor
- inspected June 2024
- Type
- Girder and Floorbeam System
- Steel
- Length
- 146 ft
- 1 main span
- Daily traffic
- 3,509
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Baird Blvd(co 608) over US 30 is a steel girder and floorbeam system carrying Baird Blvd(co 608) over US 30 in Camden County, New Jersey. It was built in 1949, so it is 76 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 3,509 vehicles a day, roughly 4% of them trucks, projected to reach 4,282 by 2042. The structure is 146 ft (44.5 m) long and 61 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Baird Blvd(co 608) over US 30 built?
It was built in 1949, making it 76 years old in 2025.
What condition is Baird Blvd(co 608) over US 30 in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2024.
How much traffic does Baird Blvd(co 608) over US 30 carry?
About 3,509 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is Baird Blvd(co 608) over US 30?
The structure is 146 ft (44.5 m) long with a longest span of 132 ft (40.2 m) and a deck 61 ft wide.
Who owns Baird Blvd(co 608) over US 30?
It is owned by the State Highway Agency.