Fairview Ave over Pascack Brook
GoodBergen County, New Jersey · 0.1 MI S. of Laurence ST · Structure no. 020027E
- Built
- 2000
- 25 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 72 ft
- 1 main span
- Daily traffic
- 2,364
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Fairview Ave over Pascack Brook is a prestressed concrete box beam or girders - multiple carrying Fairview Ave over Pascack Brook in Bergen County, New Jersey. It was built in 2000, so it is 25 years old, younger than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,364 vehicles a day, roughly 1% of them trucks, projected to reach 2,828 by 2044. The structure is 72 ft (21.9 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fairview Ave over Pascack Brook built?
It was built in 2000, making it 25 years old in 2025.
What condition is Fairview Ave over Pascack Brook in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Fairview Ave over Pascack Brook carry?
About 2,364 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Fairview Ave over Pascack Brook?
The structure is 72 ft (21.9 m) long with a longest span of 67 ft (20.4 m) and a deck 44 ft wide.
Who owns Fairview Ave over Pascack Brook?
It is owned by the County Highway Agency.