Closter Rd-Cr 102I over Tappan Run
FairBergen County, New Jersey · 0.05 Miles E of Route 39 · Structure no. 020024C
- Built
- 1973
- 52 years old
- Condition
- Fair
- inspected April 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 4,072
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Closter Rd-Cr 102I over Tappan Run is a prestressed concrete slab carrying Closter Rd-Cr 102I over Tappan Run in Bergen County, New Jersey. It was built in 1973, so it is 52 years old, younger than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,072 vehicles a day, roughly 4% of them trucks, projected to reach 4,969 by 2044. The structure is 44 ft (13.4 m) long and 56 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Closter Rd-Cr 102I over Tappan Run built?
It was built in 1973, making it 52 years old in 2025.
What condition is Closter Rd-Cr 102I over Tappan Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Closter Rd-Cr 102I over Tappan Run carry?
About 4,072 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is Closter Rd-Cr 102I over Tappan Run?
The structure is 44 ft (13.4 m) long with a longest span of 42 ft (12.8 m) and a deck 56 ft wide.
Who owns Closter Rd-Cr 102I over Tappan Run?
It is owned by the County Highway Agency.