US Bridges

First Street over Metzlers Brook

Fair

Bergen County, New Jersey · 0.5 MI N of Nj RTE 4 · Structure no. 020015K

Built
1971
54 years old
Condition
Fair
inspected April 2024
Type
Slab
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
1,490
2024 count
Owner
County
County Highway Agency

About this bridge

First Street over Metzlers Brook is a prestressed concrete slab carrying First Street over Metzlers Brook in Bergen County, New Jersey. It was built in 1971, so it is 54 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,490 vehicles a day, roughly 1% of them trucks, projected to reach 1,818 by 2044. The structure is 40 ft (12.2 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFirst Street
CrossesMetzlers Brook
Location0.5 MI N of Nj RTE 4
RouteCity Street 0
Coordinates40.8895, -73.9843
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length40 ft (12.2 m)
Longest span34 ft (10.4 m)
Deck width40 ft (12.2 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,490 (2024)
Projected traffic1,818 by 2044
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was First Street over Metzlers Brook built?

It was built in 1971, making it 54 years old in 2025.

What condition is First Street over Metzlers Brook in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does First Street over Metzlers Brook carry?

About 1,490 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is First Street over Metzlers Brook?

The structure is 40 ft (12.2 m) long with a longest span of 34 ft (10.4 m) and a deck 40 ft wide.

Who owns First Street over Metzlers Brook?

It is owned by the County Highway Agency.