Main ST (cr 56III) over River Line&leonia Avenue
FairBergen County, New Jersey · 0.30 Mi. E. of River Road · Structure no. 020004C
- Built
- 1939
- 86 years old, rebuilt 2003
- Condition
- Fair
- inspected April 2024
- Type
- Girder and Floorbeam System
- Steel
- Length
- 438 ft
- 2 main spans
- Daily traffic
- 15,680
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Main ST (cr 56III) over River Line&leonia Avenue is a steel girder and floorbeam system carrying Main ST (cr 56III) over River Line&leonia Avenue in Bergen County, New Jersey. It was built in 1939 and reconstructed in 2003, so it is 86 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,680 vehicles a day, roughly 4% of them trucks, projected to reach 19,065 by 2042. The structure is 438 ft (133.5 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main ST (cr 56III) over River Line&leonia Avenue built?
It was built in 1939, making it 86 years old in 2025. It was reconstructed in 2003.
What condition is Main ST (cr 56III) over River Line&leonia Avenue in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Main ST (cr 56III) over River Line&leonia Avenue carry?
About 15,680 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is Main ST (cr 56III) over River Line&leonia Avenue?
The structure is 438 ft (133.5 m) long with a longest span of 75 ft (22.9 m) and a deck 53 ft wide.
Who owns Main ST (cr 56III) over River Line&leonia Avenue?
It is owned by the County Highway Agency.