Nh 16 SP Tpk Ramp over Cocheco River
GoodStrafford County, New Hampshire · SB Offramp over Cocheco · Structure no. 022201040009100
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 145 ft
- 1 main span
- Daily traffic
- 2,885
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Nh 16 SP Tpk Ramp over Cocheco River is a steel stringer/multi-beam or girder carrying Nh 16 SP Tpk Ramp over Cocheco River in Strafford County, New Hampshire. It was built in 2012, so it is 13 years old, younger than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,885 vehicles a day, roughly 5% of them trucks, projected to reach 4,269 by 2043. The structure is 145 ft (44.2 m) long and 31 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nh 16 SP Tpk Ramp over Cocheco River built?
It was built in 2012, making it 13 years old in 2025.
What condition is Nh 16 SP Tpk Ramp over Cocheco River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Nh 16 SP Tpk Ramp over Cocheco River carry?
About 2,885 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Nh 16 SP Tpk Ramp over Cocheco River?
The structure is 145 ft (44.2 m) long with a longest span of 141 ft (42.9 m) and a deck 31 ft wide.
Who owns Nh 16 SP Tpk Ramp over Cocheco River?
It is owned by the State Toll Authority.